WPC Board Sanding Machine

This machine is used for surface dealing of the thickness sanding, fine sanding of various board. Transfer plate elevation adopts microcomputer digital control with the advantages of easily operated and high precision.

Product Details

Wpc board sanding machine

This machine is used for surface dealing of the thickness sanding, fine sanding of various board. Transfer plate elevation adopts microcomputer digital control with the advantages of easily operated and high precision. It is the ideal auxiliary processing equipment for wood plastic producer.


Technical parameters:

1 The max producing width: 600 mm

2. Producing thickness: 1-180mm

3. Abrasive belt: 1520×630mm

4. Feeding speed: 4-14m/min, frequency control

5. Total power: 23.87KW

6. Weight: 2T

7. Overall size: 1800×1200×1750mm

8. Produce and rubbing consumption: abrasive belt


WPC Board Sanding Machine Specification Data:

Name

Specification

Quantity

Function

Reduction box

075 series

1

Usd for transfering

Motor

1.5KW

1

Usd for transfering

Main grinding wheel

Φ180 steel roll

2

Used for grinding

Conveyor belt

3274×630

1

Used for feeding

Tightening cylinder

SC125×35

2

Used for tightening abrasive belt

Whiff forked board


2

Used for abrasive belt control

Reduction box

WPD50 1:60

1

Used for lift transfering

Motor

180W-4B5

2

Used for lifting and brush

Press roller wheel

Φ60

6

Used for press roller

Pneumatic valve

4A210-8

2

Used for wander control

Air channel switch

MSV86321TP

2

Used for abrasive belt tightening

Electromagnetic valve

4V210-8

1

Used for braking control

Digital show

Digital control lift

1

Used for thickness show

Distance switch

8166

4

Used for abrasive belt limited position

Pneumatic cylinder

SC50×25

2

Used for braking

Main motor

11+11KW

2

Used for main grinding wheel


FAQ:

Q: How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.

Customer pay for visa, round air tickets, accommodation and USD100/day/person.

Q: How long time for installation?

A: According your machines order,we will send one or two engineers to your plant,it will take about 15 days to 30 days.

Q: How about the spare parts?

A: We will send one year enough easy broken spare parts together with the machines,shipping together. During the warranty time,we will supply the spare parts at our cost price including the delivery fees.


Inquiry